Toolvito

Calculates on this device. File exports run online.

Field Service Planner

List today’s jobs with their place, time on site and the window the customer gave, say how many technicians you have and when their shift starts and ends, and get a timetable for each technician that keeps every window and brings everyone back in time. The box below finds the best plan with a solver and proves it. A second calculator works out the cost and the price of a job or a yearly maintenance contract.

Enter your values

Jobs with time windows shared among technicians, with a timetable for each.

Your values

In a city about 20 to 30 km/h.

Jobs

More options

Roads are longer than straight lines: about 1.2 to 1.4.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose the button below them.

Find the best plan

Find the best plan

The jobs, technicians and shift of Plan technicians’ routes above are used: press Plan the day there first. The solver searches for the plan with the least total driving that does every required job within its window, and as many optional jobs as fit by priority.

The plan and prices above are worked out in your browser. When you use this box, the depot, the jobs (names, places, times) and the shift are sent to the Toolvito server. Download the result within one hour after the job finishes. Choose Delete files now to request earlier removal. The hourly cleanup normally removes files within one to two hours after completion.

How to use it

  1. Choose Plan technicians’ routes and add the jobs: a name, the latitude and longitude, the minutes on site and, if the customer gave one, the window (from and until). Mark jobs that can wait as optional, with a priority.
  2. Give the depot, the number of technicians and the shift, and press Plan the day.
  3. Use Find the best plan below for a plan with the least driving, proved by the solver, and compare it with the quick plan.
  4. Choose Cost and price a job or contract to price a visit or a year of visits.

How the plan is made

  • The quick plan puts required jobs first, then optional ones by priority, each where it adds the least driving while every window and the shift still hold.
  • The solver (OR-Tools CP-SAT) looks for the plan with the least total driving among all plans that do every required job and keep every window, and proves when no better one exists.
  • Travel is the straight-line distance over the Earth times a road factor, at an average speed: not a road route, and without traffic.

Related tools