Toolvito

Works on this device

Landscaping Quote Calculator

Write a landscaping quote from your own numbers. The tool works out cubic metres or cubic yards of mulch, soil or gravel from area and depth, counts plants from area and spacing, adds your materials and labour, and then adds overhead, profit, discount and tax in a stated order. You get the quote as text to copy or download.

Enter your values

Bulk materials by area and depth, plants by spacing, other materials and labour. The tool adds waste, markup, overhead, profit, discount and tax in a fixed order and writes the quote as text.

Your values

Leave blank when there is none.

Leave blank when there is none.

Added to bulk materials and other materials for spillage, settling and offcuts. Not added to plants.

Markup is profit as a share of your cost. 0 passes materials on at cost.

For vehicles, insurance, tools and office time that the lines do not cover.

Markup is profit ÷ cost. Margin is profit ÷ price. The same percent gives different prices.

Leave blank for a quote without tax. The rate and what it applies to are set by your tax office: look them up there. The example value is not a current rule.

Mulch, soil, gravel or sand, by area and depth

The tool works out the volume from the area and the depth. The cost is what you pay your supplier for one cubic metre or one cubic yard.

Plants, by area and spacing

The tool works out how many plants fill the area at this spacing. A square grid gives one plant for each spacing × spacing. Staggered rows fit about 15% more.

Other materials

Anything you buy by the piece, the metre, the square metre, the roll or the bag. The unit is a label for the quote.

Labour

Your own hours and your own rate. No work rates or labour rates are built in.

More options

When ticked, the text for the customer has no overhead or profit line: both are shared over the lines by their size.

A label only. No amount is converted.

This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose Build a landscaping quote, and choose metric or imperial measurements.
  2. Choose Try an example, or pick an example job, to see a filled quote. The example numbers are made up.
  3. Add bulk materials with their area and depth, plants with their area and spacing, and other materials by quantity. Type what each one costs you.
  4. Add labour rows: the hours for one person, the number of people and your rate for one hour.
  5. Enter a waste allowance, a markup on materials, overhead, profit and a tax rate if you must charge tax. Type 0 for a step you do not use.
  6. Choose Calculate. Check the two tables, then copy or download the quote text. You can save your entries on this device.

Quantities

  • Volume, metric = area in m² × depth in cm ÷ 100, in cubic metres.
  • Volume, imperial = area in ft² × depth in inches ÷ 12 ÷ 27, in cubic yards. One cubic yard is 0.764554857984 m³.
  • Plants in a square grid = area ÷ (spacing × spacing), rounded up.
  • Plants in staggered rows = area ÷ (spacing × spacing × 0.866), rounded up. Staggered rows fit about 15% more plants at the same spacing.
  • The plant count is by area. A real bed has edges, so a narrow or curved bed can need a few more or fewer plants.

The order of the money steps

  1. Material line = quantity × (1 + waste ÷ 100) × your cost for one × (1 + markup ÷ 100). No waste is added to plants.
  2. Labour line = hours for one person × people × rate for one hour.
  3. Subtotal = materials and plants + labour + delivery, hire and travel.
  4. Overhead = subtotal × overhead percent ÷ 100.
  5. Profit as a markup = (subtotal + overhead) × profit percent ÷ 100. As a margin: price = (subtotal + overhead) ÷ (1 − profit percent ÷ 100).
  6. Discount = price before discount × discount percent ÷ 100.
  7. Tax = price before tax × tax rate ÷ 100.

Worked example

A new bed of 24 m² gets 7.5 cm of bark mulch and 10 cm of topsoil. The mulch is 24 × 7.5 ÷ 100 = 1.8 m³, and with 10% waste 1.98 m³. At a cost of 48 for one m³ and a 25% markup, the line is 118.80. The topsoil is 2.64 m³ at 36: also 118.80.

Lavender fills 6 m² in staggered rows at 40 cm: 6 ÷ (0.4 × 0.4 × 0.866) = 43.3, so 44 plants. At 4.20 each with the markup, the line is 231.00. Edging and membrane add 160.88 and 44.00.

Labour is 6 hours and 5 hours for 2 people at 34 for one hour: 408.00 and 340.00. Delivery and travel are 125.00. The subtotal is 1,546.48.

Overhead of 10% is 154.65. Profit as a 15% markup on 1,701.13 is 255.17, so the price before tax is 1,956.30. Tax at an example rate of 8% is 156.50, and the total is 2,112.80.

Other things this tool works out

  • Mulch, soil or gravel: the volume for an area, a rectangle or a circle, in cubic metres and cubic yards, with bags, cost and weight from your own bag size, price and density.
  • Number of plants: the count for a spacing, or the spacing for a number of plants.
  • Price of a regular service visit: for mowing, hedge trimming, maintenance and seasonal clean-ups, from hours or from an area and your own work rate, with the price of a season.

Limits you should know

  • No prices, labour rates, work rates, bag sizes, densities or tax rates are built in. Every number is your own input. The example jobs and the Try an example values are made up for trying the tool. They are not typical prices and not current rules.
  • The tool does not know how long a job takes or what a patio, an irrigation system or tree work costs in your area. You type the hours and the costs.
  • Depth is the depth after spreading. Loose material settles, so ask your supplier how much extra to order.
  • Tax is one percent on the whole price before tax. Some places tax materials and labour differently: check with your tax office. This tool is not tax or legal advice.
  • Each line is rounded to cents and half a cent rounds up. The totals are sums of the rounded lines.
  • The quote text is a plain estimate. It is not an invoice or a contract.

Related tools