Logistics Performance Calculator
Measure how well deliveries, stock and warehouse work are going. Each measure is a simple ratio, and the page shows its formula. No benchmark is built in: you compare the result with your own target.
Enter your values
Check these values
This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose what you want to measure.
- For the delivery scorecard, enter one row for each week or month: the orders delivered, and how many were on time, complete, free of damage and had correct documents. You can also paste the rows from a spreadsheet.
- For a single measure, choose A rate from two counts, pick the measure, and enter the total and the part.
- Choose Calculate. The scorecard shows a table of rates and a chart of the trend. You can copy the result or download it as a CSV file.
- To keep your rows for next time, tick Save my entries on this device, or download them as a file.
The measures and their formulas
- On-time delivery rate = orders delivered on time ÷ orders delivered × 100.
- Order fill rate = orders shipped complete ÷ orders received × 100. The line fill rate and the unit fill rate use order lines and units in the same way.
- Perfect order rate = on-time rate × complete rate × damage-free rate × correct documents rate. With four rates of 95%, 97%, 99% and 98.5% the answer is 89.86%.
- Order cycle time = delivery date − order date, in calendar days. The page gives the average, the middle value, the shortest and the longest.
- Inventory turnover = cost of goods sold ÷ average inventory. Days of inventory = average inventory ÷ cost of goods sold × days in the period.
- Cost for one order = total logistics cost ÷ orders shipped. Cost for one unit = total logistics cost ÷ units shipped.
- Utilisation of a truck or container = amount loaded ÷ capacity × 100, for weight, volume and pallet places.
- Picking accuracy = (picks − picking errors) ÷ picks × 100. Damage rate = damaged ÷ shipped × 100.
- Handling rate = work handled ÷ labour hours used.
Worked example
In a month, 2,480 orders were delivered and 2,356 of them were on time. The on-time delivery rate is 2,356 ÷ 2,480 × 100 = 95%. The other 124 orders were late, which is 5%.
With a target of 96%, the month needed at least 2,381 orders on time, because 96% of 2,480 is 2,380.8. That is 25 more than were on time.
Stock: the cost of goods sold in a year was 840,000, and the inventory was 130,000 at the start and 150,000 at the end. The average inventory is 140,000, the turnover is 840,000 ÷ 140,000 = 6 times, and the days of inventory are 365 ÷ 6 = 60.8 days.
Limits you should know
- No benchmark, industry average or "good" value is built in. Good values differ by trade, product and contract.
- The perfect order rate as a product takes the four parts as independent. When the same orders tend to be late and damaged, the real rate is higher. A direct count of orders with no fault is the measured rate.
- Companies define "on time", "complete" and "damage" in their own ways. Use the same rule in every period, or the trend means little.
- Order cycle time counts calendar days, with weekends and holidays.
- Utilisation does not check legal weight limits, axle loads or how the load is placed.
- The handling plan takes the same rate for a new workload. Real rates change with order size and the mix of goods.