Processed online by Toolvito
Systematic Review Organizer
Type your studies to pool them: get the pooled effect, the heterogeneity and a forest plot to download. Draw the PRISMA flow of your records, and screen abstracts against your criteria.
Meta-analysis and forest plot
- Choose what you have for each study: an effect with its 95 % confidence interval (odds, risk or hazard ratio; mean difference), the counts of a 2 x 2 table, or means with SD and group sizes.
- Type one study per line, the name first, then the numbers, separated by |. For example “Smith 2019 | 0.80 | 0.60 | 1.07”.
- Choose random effects (DerSimonian-Laird) or a fixed effect (inverse variance), then press Pool the studies.
- Download the forest plot, the funnel plot (3 studies or more) and the CSV. Ratios are pooled on the log scale.
How it is worked out
- Standard errors come from the confidence interval (its width divided by 2 × 1.96), from the 2 x 2 counts, or from the SDs; Hedges’ g corrects the standardised mean difference for small groups.
- A study with a zero cell gets 0.5 added to every cell; a study with no events in either group is left out and named.
- Heterogeneity: Cochran’s Q, I² and τ². Egger’s test checks the funnel for asymmetry; with fewer than 10 studies it has little power.
- It is arithmetic on your numbers: it does not judge the quality or the risk of bias of the studies.
PRISMA flow and screening
Draw the PRISMA flow places your counts in the boxes of the PRISMA 2020 flow diagram (databases and registers) and works out the missing boxes. A typed count that does not follow from the boxes before is pointed out. Check the result against the official template before you publish it.
Screen abstracts with AI suggests include, exclude or unsure for up to 15 records, with the criterion and a quote from the record that is checked to be there. It is a help for the reviewers, not their decision.