Works on this device
Mechanical Advantage Calculator
Find how much a simple machine multiplies your force. Choose a lever, a wheel and axle, a pulley system, a ramp, a wedge or a screw and enter its sizes, or enter the load and the effort of any machine. You get the ideal and the actual mechanical advantage and the velocity ratio.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose the machine. If you measured the load and the effort of any machine, choose Mechanical advantage from the load and the effort.
- Enter the sizes of the machine: the two arms of a lever, the two diameters of a wheel and axle, the rope parts of a pulley system, the length and height of a ramp, the length and thickness of a wedge, or the handle and pitch of a screw.
- Leave the efficiency at 100 for the ideal machine, or type the efficiency of your machine.
- Enter the load to see the effort it needs.
- Choose Calculate.
The formulas
- Actual mechanical advantage: AMA = load ÷ effort. Velocity ratio: VR = distance the effort moves ÷ distance the load moves. Efficiency = AMA ÷ VR.
- Ideal mechanical advantage (IMA), with no friction, equals the velocity ratio. With an efficiency: AMA = IMA × efficiency.
- Lever: IMA = effort arm ÷ load arm.
- Wheel and axle: IMA = wheel diameter ÷ axle diameter when you turn the wheel.
- Pulley system: IMA = the number of rope parts that hold up the load.
- Inclined plane: IMA = length of the slope ÷ height = 1 ÷ sin θ.
- Wedge: IMA = length of the sloping side ÷ thickness of the wide end.
- Screw: IMA = 2π × handle radius ÷ lead, with lead = pitch × number of starts.
Worked example
A machine lifts a load of 600 N with an effort of 150 N, so AMA = 4. The effort moves 5 m while the load rises 1 m, so VR = 5 and the efficiency is 4 ÷ 5 = 80%. The work in is 750 J and the useful work out is 600 J.
A lever with an effort arm of 2 m and a load arm of 0.5 m has IMA = 4. A load of 400 N needs an effort of 100 N.
A pulley system with 4 rope parts has IMA = 4. At 90% efficiency the AMA is 3.6, and a load of 400 N needs 400 ÷ 3.6 = 111.1 N.
A ramp 5 m long rises 1 m: IMA = 5 and the slope is 11.54°. Pushing 400 N up it takes 80 N with no friction.
A screw with a handle radius of 250 mm and a pitch of 5 mm has IMA = 2π × 250 ÷ 5 = 314.16. At 30% efficiency the AMA is 94.25, so a load of 10 kN needs 106.1 N on the handle. The efficiencies here are examples for trying the tool.
Limits you should know
- The results are ideal arithmetic. They are not a strength or safety check of a real machine and not professional advice. The working load limit that is marked on lifting equipment decides what it may lift.
- Friction is one efficiency that you type. Real efficiencies change with the load, the speed and the lubrication. Wedges and screws often lose most of the work to friction.
- For a lever with the force on its fulcrum, use the Lever Calculator. For a block and tackle with the friction of each pulley, use the Pulley Calculator.
- For the advantage of gears, use the Gear Calculator. For a screw jack with thread friction, use the Screw Jack Calculator.