Toolvito

Works on this device

Event Logistics Calculator

Five small calculators for the day of an event: a run of show with the start and end time of each part, set-up and tear-down times counted from the doors and the end, staff from your own ratios, shuttle trips, and parking spaces.

Enter your values

List the parts of the programme with their lengths. One part has a fixed time. The others are counted forwards and backwards from it.

Your values

A time that cannot move, such as the time the doors open or the main act starts.

The row that starts at the fixed time. Rows above it are counted back from that time.

Parts of the programme

One row for each part of the programme, in order, with its length in minutes. Gap after is time before the next part starts, for a change of room or of stage. The parts the page starts with are an example.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose the button below them.

How to use this calculator

  1. Choose what you want to work out in the first menu.
  2. For a schedule, list the parts in order with the length of each in minutes. Add a gap after a part when people need time to move.
  3. Type the fixed time and the number of the row that starts at that time. The other rows are counted forwards and backwards from it.
  4. For staff, shuttle and parking, change the example numbers to your own.
  5. Choose the button under the form. Copy the result, download it as a CSV file or a text file, or print it.

The formulas

  • Run of show: start of a part = end of the part before it + the gap after that part. End = start + length. Parts above the fixed part are counted back in the same way.
  • Set-up: ready time = doors − your margin. Start of the set-up = ready time − all task lengths and gaps. Tear-down starts at the end of the event and runs task after task.
  • Staff for a role = guests ÷ guests for each one, rounded up, and not less than the smallest number you typed. Pay = staff × hours × pay for each hour.
  • Shuttle trips = guests ÷ seats in one vehicle, rounded up. One cycle = 2 × drive one way + getting on and off. A vehicle brings its first load after getting on and off + drive one way, and each further load one cycle later.
  • Vehicles needed = trips ÷ the trips one vehicle can make in your time, rounded up. Time needed = (rounds − 1) × cycle + getting on and off + drive one way, with rounds = trips ÷ vehicles, rounded up.
  • Guest cars = guests × share by car ÷ 100 ÷ people in one car, rounded up. Parking spaces = (guest cars + other cars) × (1 + spare ÷ 100), rounded up.

Worked example

The example programme starts at 09:00 with 30 minutes of welcome. Its eight parts are 305 minutes long and have 20 minutes of gaps, so it ends 5 hours 25 minutes later, at 14:25. Lunch starts at 11:30 and the workshop at 12:30.

Set-up: the doors open at 18:00 and you want to be ready 30 minutes before, at 17:30. The six tasks take 45 + 90 + 60 + 60 + 30 + 20 = 305 minutes and one gap of 15 minutes, 5 hours 20 minutes in all. So the set-up starts at 12:10. The event ends at 23:00 and the five tear-down tasks take 190 minutes, so the tear-down ends at 02:10 on the next day. From the first task to the last you are on site for 14 hours.

Staff for 300 guests: one person at the welcome desk for every 100 guests is 3, at the bar for every 50 is 6, for food service for every 25 is 12, helpers for every 75 is 4, and cleaning for every 150 is 2. That is 27 people. With 6 hours each, the four roles with a rate cost 252 + 540 + 1,044 + 156 = 1,992.00.

Shuttle: 180 guests in vehicles of 50 seats need 4 trips. With 10 minutes of driving one way and 8 minutes for getting on and off, a cycle is 28 minutes. One vehicle brings a load after 18 minutes and a second load after 46 minutes, so it makes 2 trips in 60 minutes. You need 2 vehicles, and the last guests arrive after 46 minutes.

Parking: 70% of 300 guests is 210 guests by car. With 2.5 people in a car that is 84 cars. With 15 other cars and 5% spare: 99 × 1.05 = 103.95, so plan 104 spaces.

Limits you should know

  • The ratios, shares and lengths are your own values. The ones the page starts with are examples, not rules.
  • Where a licence, an insurer or a local authority sets a number of stewards, security staff, first aiders or parking spaces for disabled guests, that number decides. This page does not know those rules.
  • Tasks are done one after another. Two teams that work at the same time are not modelled: give such a pair one row with the longer length.
  • The shuttle counts every vehicle as full and as the same size, and it does not count traffic, waiting or breaks of the drivers. Add them to the drive time.
  • Pay is staff × hours × rate only. Breaks, overtime, taxes and other costs of work are not counted.
  • Times are shown in the clock style you choose. A time on another day says so, for example "00:15 (next day)".
  • This page does not work out power, sound, light, waste or weather plans.

Related tools