Campaign Pacing Calculator
Check whether a campaign spends at the pace of its plan. Compare the spend so far with an even plan or with your own plan by week or flight, see if it is over or under pace, and find the daily spend that uses up the rest of the budget by the last day.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use the campaign pacing calculator
- Choose Pacing against an even plan for one campaign that should spend the same on every day.
- Type the budget, the first and the last day, the amount spent so far, and the last day that amount covers.
- Choose Calculate. The result gives the pacing, the status, the budget left and the daily spend that finishes on budget.
- For a plan that is not even, choose Pacing against a plan by period and type the planned and actual spend of each week. For many campaigns at once, choose Pacing of several campaigns on one date.
The formulas
- Planned spend to date (even plan) = total budget × days gone ÷ days the ads run. The first day, the last day and the day of the amount spent all count.
- Planned spend to date (plan by period) = the planned spend of the periods that have an actual spend.
- Pacing = spent so far ÷ planned spend to date × 100. 100% is on plan.
- Status: over pace above 100% + your tolerance, under pace below 100% − your tolerance, otherwise on pace.
- Daily spend needed to finish on budget = budget left ÷ days left, rounded down to the cent.
- Spend by the last day at this pace = spent so far ÷ days gone × days the ads run.
Worked example
Budget 3,000.00 from 1 to 30 November (30 days). Up to and including 12 November (12 days gone), 1,350.00 is spent. Planned spend to date = 3,000.00 × 12 ÷ 30 = 1,200.00. Pacing = 1,350.00 ÷ 1,200.00 × 100 = 112.50%, so with a tolerance of 10% the campaign is over pace.
Budget left = 1,650.00 for 18 days, so the daily spend that finishes on budget is 1,650.00 ÷ 18 = 91.6667, rounded down to the cent: 91.66. At the pace so far the campaign would spend 3,375.00, which is 375.00 over the budget.
With a plan by week of 500.00, 800.00, 1,000.00 and 700.00, and 520.00 and 610.00 spent in the first two weeks, the pacing is 1,130.00 ÷ 1,300.00 = 86.92%: under pace. The 1,870.00 left is shared as 1,100.00 and 770.00 for weeks 3 and 4.
Related calculators
- A daily budget from a total budget and dates, and the same even pacing: Daily Ad Spend Calculator. Both tools count the days in the same way.
- When a budget runs out at the current spend: Budget Exhaustion Calculator.
- The budget split across channels: Media Mix Calculator.
Limits you should know
- The plan is yours: an even pace, or the amounts you type for each period. The tolerance for on pace is your own choice; 10% is only an example.
- Ad platforms may spend more than a daily budget on some days and less on others. Check the rules of your platform; this tool holds none of them.
- Days are calendar days in one time zone. A day that is only partly over is counted as a whole day when you type it as the date of the amount spent.
- When the date is left blank, today comes from the clock of this device.