Toolvito

Works on this device

Content Repurposing Planner

Start from one piece of content, such as a blog post, a video or a podcast episode, and plan the new pieces you will make from it. Give each piece a format, a channel, a length, a due date or the days after the source, an owner and a status. The planner shows the plan in date order, what is overdue and what is due next, and gives a calendar file.

Enter your values

Your values

The post, video, episode or talk that the new pieces are made from.

Pieces with "days after the source" are dated from this day.

Leave it empty to use today on this device. Pieces due before this date that are not published are overdue.

New pieces from the source

One row for each new piece. Length or size in your own words, such as 60 seconds, 800 words or 8 slides. Type a due date, or the number of days after the source is published.

This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Update.

How to use this planner

  1. Type the title of the source piece and, if you like, its kind and the date it was published.
  2. Type one row for each new piece: the format, the channel and the length or size in your own words, such as 60 seconds or 8 slides.
  3. Give each piece a due date, or the number of days after the source is published. Name the owner and choose the status.
  4. Leave the date to check empty to use today. Choose Update. Choose Try an example to see a filled-in plan first.
  5. Download the calendar file to put the due dates into your calendar, or print the plan. Turn on "Save my entries on this device" to keep the plan in this browser.

What the planner works out

  • Due date = the date you typed, or the date the source was published + the days after it.
  • Overdue: a piece that is not published and is due before the date used. Next due: the first piece in date order that is not published and is due on or after the date used.
  • Published in percent = pieces with the status Published ÷ all pieces × 100.
  • Tables of the pieces by status, by channel and by owner, and a calendar file with an all-day event for each piece still to publish.

Worked example

The example source, a blog post published on 5 October 2026, gives 6 new pieces. The short video is due 3 days later, on 8 October, and is published. The newsletter section is due 12 days later, on 17 October.

Checked on 15 October 2026, 1 of the 6 pieces is published (17%). The carousel was due on 14 October and is still in review, so it is overdue by 1 day. The next piece due is the newsletter section, 2 days later.

The plan runs from 8 to 21 October 2026. The thread has no due date and the quote images have no owner. The calendar file holds the 4 pieces that are still to publish and have a due date.

Limits you should know

  • The planner keeps your own plan. It gives no rule of any platform, such as video lengths or image sizes: check the current guidelines of each channel.
  • This page sends no reminders and posts nothing. Your plan stays on your device unless you save it on this device or download it.
  • To check each piece before it is published, use the Content Approval Checklist.

Related tools