Project Handover Checklist

Get a checklist for handing over a project, made for what is handed over: a project to operations, a software system, a building, a new home, a project to a new project manager, or a new customer from sales. The items are grouped by area and get a due date from your handover date. Set the status of each item, give it an owner, and print or save the list.

Enter your values

Choose what is handed over. The tool makes a checklist by area, with a due date for each item when you give a handover date.

Your values

With a date, each item gets a due date: the handover date plus its days from the handover.

This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose the button below them.

How to use this tool

  1. Choose Make a handover checklist, then choose what is handed over, or pick one of the Kinds of handover.
  2. Enter the handover date if you know it, and choose Make the checklist.
  3. Choose Tick and edit this list under the result. The list moves into rows where you set each item to open, in progress, done or not needed, name who does it and change its due date.
  4. Remove items that do not fit and add your own. Enter a date to check to count the open items that are past their due date.
  5. Tick Save my entries on this device to keep the list in this browser, or download it as a file. Download the list as plain text, Markdown, CSV or a page file to print with lines to sign.

How the checklist is made

The tool holds a set of items. Each item has an area, a number of days from the handover date, and the kinds of handover it fits. For example, "Check that backups run and that a restore has been tested" is added for a software system, and "Walk the site with the owner and make a list of defects" for a building.

The areas are: documents, access and accounts, open tasks and risks, contacts, systems and equipment, knowledge sessions, and acceptance and sign-off.

The due date of an item is the handover date plus its days from the handover. An item is late when it is open or in progress and its due date is before the date to check. The percent done leaves out the items marked not needed.

Worked example

A project handed to operations gives 27 items: 5 documents, 4 for access and accounts, 5 open tasks and risks, 3 contacts, 3 for systems and equipment, 3 knowledge sessions and 4 for sign-off. With the handover date Friday, 26 February 2027, the earliest item is due on Friday, 5 February 2027, 21 days before the handover.

In the example tick list, 5 items are done, 2 are in progress and 1 is not needed, so 5 of 26 needed items are done (19%). With the date to check 15 February 2027, 11 days before the handover, 5 open items are past their due date.

Limits you should know

  • The items are general good practice. They do not know your contract, your building rules or the rules for selling a home where you live. Check them with the people who sign the handover.
  • The tool does not send, sign or store anything for you. It keeps your list in this page.
  • Due dates are counted in calendar days. Weekends and public holidays are not taken into account.
  • Up to 200 items can be kept in a list. The list stays on your device and is not sent anywhere.