Works on this device
Job Costing Calculator
Add up what one job costs: the materials and labour you can trace to it, and a share of overhead applied by a predetermined rate. The tool builds a job cost sheet, gives the cost for one unit and a price from your margin or markup, and compares applied overhead with actual overhead.
Enter your values
Check these values
This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose Job cost sheet: materials, labour and applied overhead.
- List the direct materials of the job: the quantity and the cost for one.
- List the direct labour: the hours and the rate for one hour.
- Choose how overhead is applied, such as by direct labour hours, and type your predetermined overhead rate. Use the second option of the tool to work the rate out.
- Enter the units made in the job. If you want a price, choose a margin or a markup.
- Choose Calculate. You can save your entries on this device and download the sheet as a CSV file.
The method
This is job-order costing with a predetermined overhead rate, also called normal costing. Direct materials and direct labour are traced to the job at their real cost. Overhead, such as rent, power and supervision, cannot be traced to one job, so it is applied with a rate that is set before the period starts.
- Predetermined overhead rate = estimated overhead for the period ÷ estimated base for the period. The base can be direct labour hours, direct labour cost, machine hours or units.
- Applied overhead = predetermined rate × the base the job really used.
- Job cost = direct materials + direct labour + other direct costs + applied overhead.
- Cost for one unit = job cost ÷ units made.
- Over- or under-applied overhead = applied overhead − actual overhead. Above 0 it is over-applied, below 0 it is under-applied.
- Price from a margin = job cost ÷ (1 − margin ÷ 100). Price from a markup = job cost × (1 + markup ÷ 100).
Worked example
A shop expects 180,000 of overhead and 12,000 direct labour hours in the year. The predetermined rate is 180,000 ÷ 12,000 = 15 for one direct labour hour.
Job 104 uses 12 steel plates at 18.50 and 200 fasteners at 0.12: 246.00 of direct materials. It takes 14 hours at 32 and 9 hours at 28: 700.00 of direct labour and 23 hours. Applied overhead is 23 × 15 = 345.00.
The job cost is 246.00 + 700.00 + 345.00 = 1,291.00. For 50 units that is 25.82 for one unit. With a 30% margin the price is 1,291 ÷ 0.7 = 1,844.29. With a 30% markup it would be 1,678.30.
At the end of the year the shop worked 11,400 direct labour hours and had 176,500 of overhead. Applied overhead is 11,400 × 15 = 171,000, so overhead is under-applied by 5,500.
Limits you should know
- Every cost, rate and percent is your own input. The start values are examples.
- The tool uses one overhead rate for the job. A plant with departments or activity-based costing has several rates: add their overhead by hand as other direct costs, or run each part on its own.
- The sheet shows applied overhead, not the real overhead of the period. The two differ until the period is closed.
- How over- or under-applied overhead is closed depends on your accounting rules. This tool is not accounting or tax advice.
- Margin is profit as a share of the price. Markup is profit as a share of the cost. Tax is not added to the price.
- Money is rounded to cents and half a cent rounds up. The totals are sums of the rounded lines.