Rework Cost Calculator
Find what rework costs you: for one unit, for all the units of a week or month, and for a year. You can also add up rework, scrap, warranty and other costs of poor quality from your own figures.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose Rework cost of units or Cost of poor quality from your cost lines.
- For rework, enter the labour time for one unit, the labour cost of one hour, the overhead, the parts and the re-inspection cost, and the units reworked in the period.
- For the cost of poor quality, add one line for each cost with its kind and its amount in the period.
- Choose Calculate. Copy, print or download the result as a CSV file.
The formulas
- Labour of one unit = labour time × labour cost of one hour.
- Overhead of one unit = labour of one unit × overhead percentage, or labour time × overhead for each labour hour.
- Rework cost of one unit = labour + overhead + materials and parts + re-inspection, testing and handling.
- Rework cost in the period = units reworked × each line, rounded to the cent. In a year = the period × periods in a year.
- Cost of poor quality = the sum of the cost lines you enter. Subtotals show each kind of cost.
Worked example
Reworking one unit takes 25 minutes at 32 an hour: 13.33 of labour. Overhead at 40% of labour is 5.33, parts are 4.50 and re-inspection is 1.20, so one unit costs 24.37. For 180 units in a month the lines are 2,400.00 + 960.00 + 810.00 + 216.00 = 4,386.00.
With rework of 4,386.00, scrap of 867.50, warranty repairs of 2,150.00, return freight of 640.00 and extra inspection of 1,800.00, the cost of poor quality is 9,843.50. The failure costs are 8,043.50.
Related tools
- Scrap rates and the cost of scrap: Scrap Rate Calculator.
- How many units need rework, as first pass yield: First Pass Yield Calculator.
- Labour cost of any job: Labor Cost Calculator.
Limits you should know
- Every cost is your own figure. No rate, overhead or typical cost is built in.
- Which costs count as the cost of poor quality is your choice. This page adds up what you enter and estimates nothing.
- Lost machine time, late deliveries and lost customers are not in the result unless you add them as lines.