First Pass Yield Calculator
First pass yield is the share of units that come through a step right the first time, with no rework and no scrap. Work it out for one step, or multiply the steps of a process into the rolled throughput yield.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose First pass yield of one step or process or Rolled throughput yield over several steps.
- For one step, enter the units that entered and either the units scrapped and reworked, or the units right the first time.
- For several steps, list each step with its units in and units right the first time, or with its first pass yield in percent.
- Choose Calculate. Copy, print or download the result as a CSV file.
The formulas
- First pass yield (FPY, first-time-through) = units right the first time ÷ units that entered × 100.
- Units right the first time = units in − units scrapped − units reworked or repaired.
- Final yield (after rework) = (units in − units scrapped) ÷ units in × 100.
- Rolled throughput yield (RTY) = FPY of step 1 × FPY of step 2 × … .
- Normalized yield = RTY ^ (1 ÷ number of steps).
Worked example
1,000 units start a step. 30 are scrapped and 50 need rework. Units right the first time = 1,000 − 30 − 50 = 920, so the first pass yield is 92.00%. The final yield after rework is 970 ÷ 1,000 = 97.00%.
A process has four steps with first pass yields of 95%, 94.42%, 97.42% and 95%. RTY = 0.95 × 0.9442 × 0.9742 × 0.95, which is about 83.0%: only about 830 of 1,000 units pass every step right the first time.
Related measures
- Scrap rate by item or step and the cost of scrap: Scrap Rate Calculator.
- The cost of rework and of poor quality: Rework Cost Calculator.
- Quality as one factor of OEE: Overall Equipment Effectiveness Calculator.
- Defects per million opportunities and sigma levels are not worked out here. Process capability: Process Capability Calculator.
Limits you should know
- A unit that needed rework or repair is not right the first time, even when it was good in the end.
- RTY assumes that the steps fail apart from each other.
- The counts are your own. No target or typical yield is built in.