Your result
How it was worked out
How to use this calculator
- Choose Scrap rate, Scrap rate by item, Scrap through the steps of a process or Cost of scrap.
- Choose whether to divide the scrap by the amount produced (good and scrapped) or by the amount started (put in).
- Enter the scrap and the base amount, in pieces or in kilograms. For the cost, enter the cost of one scrapped unit.
- Choose Calculate. Copy, print or download the result as a CSV file.
The formulas
- Scrap rate = scrapped ÷ amount produced × 100, or scrapped ÷ amount started × 100.
- Scrap rate of a step = units scrapped at the step ÷ units that reached the step × 100.
- Overall yield = units at the end ÷ units started = (1 − rate of step 1) × (1 − rate of step 2) × … . Overall scrap rate = 100% − overall yield.
- Cost of scrap = units scrapped × (material + labour + overhead + disposal − value recovered) for one unit.
Worked example
A line made 1,500 units and 45 were scrapped. Scrap rate = 45 ÷ 1,500 = 3.00% of the units produced.
2,000 castings start a process. 60 are scrapped at casting, 38 at machining, 14 at finishing and 9 at inspection. 1,879 reach the end, so the overall yield is 93.95% and the overall scrap rate is 121 ÷ 2,000 = 6.05%. At 4.00, 9.50, 11.00 and 12.50 for a unit scrapped at each step, the scrap costs 240.00 + 361.00 + 154.00 + 112.50 = 867.50.
120 units are scrapped with 6.25 of material, 3.40 of labour and 1.15 of overhead in each, and 0.80 is recovered from each. Cost of scrap = 120 × 10.00 = 1,200.00.
Related tools
- Yield right the first time, with rework counted as a loss: First Pass Yield Calculator.
- The cost of rework and the cost of poor quality: Rework Cost Calculator.
Limits you should know
- Use one unit for the scrap and the base: pieces, kilograms or any other.
- Say which base you use. Scrap ÷ produced and scrap ÷ started are different numbers for the same scrap.
- This is the scrap of a production process. It does not give the price a scrap yard pays for a car or for metal.
- No typical scrap rate is built in.