Work out the cost of a building, an extension or a renovation from your own figures: floor area and a rate, rooms, or items of work. The tool adds contingency, overhead, profit, fees, permits and tax as separate steps and shows the cost for each square foot and square metre. It has no building costs of its own for any place or year, so the result is an estimate from your figures. It is not a quote, a market price or a structural design.

Enter your values

Floor area × your rate for each storey or part, then contingency, professional fees, permits and tax as separate steps.

Your values

Areas and rates below are read in this unit. Results show the cost for a square foot and for a square metre.

Site works, service connections, demolition or anything priced as one amount and not by area. It is part of the direct cost. Type 0 for none.

Example value. Money kept for surprises and changes. Use your own figure, or 0 for none.

Example value. Architect, engineer and surveyor fees. Type 0 for none. The tool does not add tax to the fees: include it in the percent if they carry tax.

Leave blank for none. Permit, plan review and connection charges are set by your local authority: ask them for the current amounts. The example value is not a real charge.

Leave blank for no tax line. The rate and what it applies to are set by your tax office: look them up there. The example value is not a current rule.

Building parts

One row for each storey or part of the building that has its own rate. The tool has no rates of its own. Take the rate from a builder's quote or a published cost guide for your place and year.

More options

Leave 0 when the rates come from a builder's quote: they already include it.

Leave 0 when the rates come from a builder's quote: they already include it.

Such as $, £ or Rs. It is only printed in the text version.

This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose what you want to work out. The first choice, Building cost from floor area and a rate, fits most new buildings.
  2. Choose the area unit: square feet, square metres or square yards. Areas and rates are read in that unit.
  3. Fill in the rows. The boxes for rates start empty, because the tool has no rates. Take a rate from a builder's quote or from a published cost guide for your place and year.
  4. Check the percent boxes. The starting values are examples. Type 0 for a step you do not use. The tax box and the permits box start empty: leave them blank for none.
  5. Choose Calculate. Read the cost summary, then copy or download the text version, or save your entries on this device or as a file.
  6. To see how the page works first, choose Try an example or an example from the menu. The example figures are made up.

What each calculation does

  • Building cost from floor area and a rate: one row for each storey or part with its own rate. Amount = floor area × rate.
  • Cost for each square foot or square metre from a known total: total cost ÷ floor area. Use it to check a quote or to compare a finished building with a new plan.
  • Split a budget by stage or trade: amount = total × your percent for that row.
  • Stage payment schedule: the percents of your contract become payment amounts, with money paid so far, money still to pay and an optional retention.
  • Move a past cost to another year: past cost × (1 + yearly percent ÷ 100) to the power of the years, or past cost × new index ÷ old index.
  • Compare two options: two floor areas, rates and fixed costs side by side with the same added steps.
  • Renovation or extension from rooms: floor area × work rate + fittings priced as one amount, for each room.
  • Itemised estimate: quantity × (material cost + labour cost) for each item of work. Use it for one trade, such as a tile floor, a fence or a demolition.
  • Material quantities: floor area × your amount of a material for one unit of area, plus waste.
  • Add contingency, overhead, profit, fees and tax to a direct cost: every step as its own line.

The order of the added steps

The steps are always worked out in this order. A calculation leaves out the steps it has no box for.

  1. Direct cost: the sum of the rows.
  2. Contingency = direct cost × contingency percent.
  3. Overhead = (direct cost + contingency) × overhead percent.
  4. Profit = (direct cost + contingency + overhead) × profit percent. This is a markup on cost.
  5. Construction price before tax = direct cost + contingency + overhead + profit.
  6. Tax = construction price before tax × your tax rate, when you type a rate.
  7. Professional fees = construction price before tax × fee percent.
  8. Permits and other fixed charges: the amount you type.
  9. Total = construction price before tax + tax + professional fees + permits and fixed charges.

Worked example

A house has a ground floor of 1,200 sq ft at 150 for each sq ft, a first floor of 900 sq ft at 135 and a garage of 400 sq ft at 60. These rates are made up for the example. The amounts are 180,000.00, 121,500.00 and 24,000.00, so the direct cost is 325,500.00.

Contingency at 10% is 32,550.00, and the construction price before tax is 358,050.00. Professional fees at 8% of that price are 28,644.00. With no tax and no permits typed, the total is 386,694.00. The floor area is 2,500 sq ft, so the total is 154.68 for each square foot, or 1,664.94 for each square metre.

The order of the steps changes the answer. Take a direct cost of 200,000.00 with contingency, overhead and profit of 10% each. Contingency is 20,000.00. Overhead is 10% of 220,000.00, which is 22,000.00. Profit is 10% of 242,000.00, which is 24,200.00. The construction price is 266,200.00. Adding the three percents to the direct cost at once would give only 260,000.00.

Where the figures come from

  • The rate for each unit of area comes from a builder's quote, from a quantity surveyor or from a published cost guide for your region and year. It differs by region, year, quality, size and market.
  • Contingency is your own choice. A renovation of an old building usually needs more than a new building on a clear site.
  • Overhead and profit are the builder's own figures. A rate from a builder's quote already includes them. So in the floor area and room calculations these two boxes are under More options and start at 0. In the itemised estimate they start with example values: type 0 if your rates include them.
  • Professional fees come from your architect, engineer and surveyor.
  • Permit and connection charges are set by your local authority, and tax by your tax office. Ask them for the current figures. The example values are for trying the tool and are not current rules.
  • A cost index is published by statistics offices and by cost data services. Use two figures from the same index series.
  • Plot sizes in units such as marla, gaj, cent or acre must be turned into square feet or square metres first. The Unit Converter can do that.

Limits you should know

  • The tool has no cost for a square foot or square metre for any place, year or type of building, no index figures, no tax rates and no permit charges. It cannot tell you what a house costs in a named city, country or year.
  • The result is an estimate from your own figures. It is not a quote, an offer, a valuation or a market price.
  • The tool does not design anything. It does not check structure, foundations, building rules or the amount of any material against a drawing.
  • The example rows, the examples in the menus and the starting percents are made up for trying the tool. They are not typical costs or standard splits.
  • Tax is one rate on the construction price before tax. Fees and permits are not taxed by the tool. Real tax rules differ by place and by the kind of work. This is not tax, legal or professional advice.
  • Money lines are rounded to the nearest cent, with half a cent rounded up, and later lines use the rounded figure.