How well a layer of fill is compacted: its dry density in the field as a percentage of the laboratory maximum dry density.

Your values

From the Proctor (or other) compaction test of this soil. The value in the box is an example.

From the project specification or the code in force. The tool holds no such figure; the example is not one.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose what you want to work out. Relative compaction from a field test is the usual site check.
  2. Type the maximum dry density from the laboratory test and the dry density measured in the field (or the bulk density and water content).
  3. If your specification asks for a relative compaction, type it to compare. The tool holds no specification figure.
  4. For a Proctor test, type each point: its water content and the mass of the mould with the compacted soil, or its dry density.
  5. Choose Calculate. The Proctor result shows the curve, the peak and the zero air voids line.

The formulas

  • Dry density: ρd = ρ ÷ (1 + w), with the water content w as a fraction.
  • Relative compaction = field dry density ÷ maximum dry density × 100.
  • Proctor point: bulk density = (mould with soil − empty mould) ÷ mould volume.
  • Peak of the curve: a parabola ρd = a + b × w + c × w² is fitted to all points by least squares. Optimum moisture content = −b ÷ (2c); maximum dry density = a − b² ÷ (4c).
  • Zero air voids line: ρd = Gs × ρw ÷ (1 + w × Gs). At a saturation S: ρd = Gs × ρw ÷ (1 + w × Gs ÷ S).
  • Fill: volume before compaction = compacted volume × compacted dry density ÷ dry density before. Water to add = dry mass × (target w − w now).

Worked examples

A field test gives a dry density of 1.78 g/cm³. The laboratory maximum dry density is 1.85 g/cm³. Relative compaction = 1.78 ÷ 1.85 × 100 = 96.2 %. From a bulk density of 1.99 g/cm³ at 11.5 % water, the dry density is 1.99 ÷ 1.115 = 1.785 g/cm³, so 96.5 %.

Five Proctor points in a 944 cm³ mould of 4,350 g give dry densities of 1.720, 1.800, 1.850, 1.820 and 1.750 g/cm³ at 8, 10, 12, 14 and 16 % water. The fitted parabola has its peak at an optimum moisture content of 12.29 % and a maximum dry density of 1.843 g/cm³. With Gs = 2.65 the zero air voids line is at 1.999 g/cm³ there, and the soil at the peak is 74.4 % saturated.

For 120 m³ of fill at 95 % of 1.85 g/cm³, the dry mass is 0.95 × 1,850 × 120 = 210,900 kg. Soil at 1.45 g/cm³ before compaction fills 145.4 m³. Raising its water from 8 % to 12 % takes 8,436 kg of water, about 8.4 m³.

Limits you should know

  • The relative compaction and the water content range a fill needs come from the project specification or the code in force where the work is done. That code decides; this tool does not give the required values.
  • The peak comes from a parabola fitted to all points. Five or more points on both sides of the peak give a reliable peak; if the peak lies outside the tested range, the page warns you.
  • Follow the method of your standard (for example ASTM D698 or D1557, BS 1377-4, EN 13286-2 or IS 2720-7/8) for the mould, the layers and the blows.
  • The field density comes from a sand cone, core cutter or gauge test; the Soil Density Calculator works it out. The water content alone is on the Soil Moisture Content Calculator. Void ratio and porosity are on the Soil Void Ratio Calculator and the Soil Porosity Calculator.
  • This is arithmetic for the values you type. Compaction must be tested and accepted under your specification by a qualified person. It is not professional advice.