RACI Matrix Maker

List the tasks and the people or roles, then give each person a letter in each task. The page counts the letters, checks the common RACI rules and makes a file you can share.

Enter your values

Name the people or roles, list the tasks, and give each person a letter. The page checks that every task has one A and at least one R.

Your values

The project, team or process this matrix is for.

Each name becomes a column. Leave a box empty to hide its column. You can name up to 8.

Tasks

Type one letter in each box: R does the work, A owns the result (one for each task), A/R is both, C is asked before, I is told after. Leave a box empty for no role.

More options

Leave it empty for no limit. For example, 3 flags anyone with 4 or more tasks as R or A.

This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Check matrix.

Download the matrix as a file

Download the matrix as a file

The file holds the matrix shown above: the summary, the matrix with its Check column, the letters of each person, the key to the letters and the notes. Excel and OpenDocument files get one sheet for each table.

More options

Leave it empty to use the title and the kind of matrix.

The calculator above works on your device. When you run a task in this section, Toolvito receives the values and result you submit to make the file or run the check. Download the result within one hour after the job finishes. Choose Delete files now to request earlier removal. The hourly cleanup normally removes files within one to two hours after completion.

What RACI means

A RACI matrix (also called a RACI chart, RACI model or responsibility assignment matrix) shows who does what in a project or process. Each row is a task or a decision. Each column is a person or a role. Each box holds one letter.

RACI stands for the four letters. A RASCI matrix adds a fifth letter, S.

The letters
Letter Name What it means
R Responsible Does the work. A task can have more than one R.
A Accountable Owns the result and signs it off. Each task has exactly one A.
A/R Accountable and Responsible Owns the result and also does the work, common in small teams.
C Consulted Is asked for advice before the work is done or the decision is made. The talk goes both ways.
I Informed Is told about progress or the decision afterwards. The talk goes one way.
S Support (RASCI only) Helps the Responsible person with the work.

How to make a RACI matrix

  1. Choose A RACI matrix, or A RASCI matrix if you also want the letter S.
  2. Pick a project type under Start from a project type, or type your own. Type up to 8 people or roles; each one becomes a column.
  3. Add the tasks or decisions, one on each row, and type a letter in each box. Leave a box empty when the person has no part in the task.
  4. Press Check matrix. You see the matrix with a Check column, the letters of each person and the problems found.
  5. To share it, choose Excel, PDF, Word or PowerPoint in the box below and press Make the file. A wide matrix fits better on a landscape page.

What the page checks

  • Every task has exactly one A. No A means nobody owns the result; two or more means the owners can block each other.
  • Every task has at least one R, so someone does the work.
  • A person or role with no letter at all: perhaps the column is not needed.
  • A person or role with a letter in every task (3 tasks or more): a column with no gaps can mean too much work.
  • Under More options you can set a limit, and the page names everyone who is R or A on more tasks than that.
  • These are common rules of thumb for RACI charts, not an official standard. They do not judge whether the right people have the letters.

Project types to start from

  • General project: sponsor, project manager, team lead, team members and stakeholders.
  • IT or software project: product owner, project manager, business analyst, developers, testers and operations.
  • Agile or Scrum team: product owner, Scrum master, developers and stakeholders.
  • Construction project: owner, architect, project manager, general contractor and subcontractors.
  • Product launch and IT support team are there too. The letters in each type are examples written for this page. Change every box to fit your team.

Limits you should know

  • A matrix has at most 8 people or roles and 60 tasks.
  • Each box takes one letter, or A/R. Other pairs, such as R and C together, are refused because they do not make sense in a RACI chart.
  • Your entries stay in this browser. Tick Save my entries on this device to keep them for your next visit.