Works on this device
Productivity Score Calculator
Get a productivity score from a method you choose and can check. Compare your output per hour with your own target, add up the points of the tasks you finished, or compare the time you planned with the time the work took.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose a method. Each one gives its own score, worked out in the open.
- Output per hour: type how much work you finished, what you count, the time you worked and your own target per hour.
- Weighted score of tasks done: list your tasks, give each one points, and tick the ones you finished. Add the time worked to see the points per hour.
- Planned time against actual time: list your tasks with the time you planned and the time each one took. Choose minutes or hours above the rows.
- Choose Calculate. The working is shown under How it was worked out. You can copy the result, print it or download it as a CSV file.
The three methods
- Output per hour = work done ÷ hours worked. Score = output per hour ÷ your target per hour × 100. 100% means exactly on your target; 80% means four fifths of it.
- Weighted score = points of the done tasks ÷ points of all tasks × 100. A task with 5 points counts five times as much as a task with 1 point.
- Planned against actual time = total planned time ÷ total actual time × 100. Above 100% means the work took less time than planned; below 100% means it took longer.
- The calculator never mixes the methods into one number, and it adds no hidden factors.
What the score means, and what it does not
- The score compares your work with your own target, your own points or your own plan. It is only as good as those numbers.
- It does not measure the quality, the value or the difficulty of the work, or how hard you tried.
- A low score against a plan can mean that the plan was too short, not that the work was slow.
- Compare a score only with the same kind of work, measured the same way, such as your own weeks one after another. Scores of different people or different jobs are not comparable.
Worked examples
Output per hour. 120 emails answered in 6 hours is 120 ÷ 6 = 20 emails per hour, or 3 minutes per email. With a target of 25 per hour, the score is 20 ÷ 25 × 100 = 80.00%. At the target, 6 hours would give 150 emails, so the day was 30 emails short.
Weighted score. Five tasks have 5, 2, 3, 1 and 2 points: 13 in all. The tasks with 5, 2 and 1 points are done: 8 points. The score is 8 ÷ 13 × 100 = 61.54%. Counted without points, 3 of 5 tasks is 60.00%. In 7.5 hours that is 1.06667 points per hour.
Planned against actual time. Four tasks were planned for 90, 45, 60 and 30 minutes (225 in all) and took 120, 40, 60 and 50 minutes (270 in all). The score is 225 ÷ 270 × 100 = 83.33%. The work took 45 minutes more than planned. Two tasks went over their plan; the report went over the most, by 30 minutes.
Which tool to use
- This page gives a score once, from numbers you type. To keep your tasks in a list with due dates over time, use the To-Do List Planner.
- For the share of assigned tasks that were completed, and on time, use the Task Completion Rate Calculator.
- For hours worked from start and end times, use the Work Hours Calculator.
Limits you should know
- Percentages are shown with 2 decimal places, rounded half away from zero. The CSV file has more digits.
- Up to 200 tasks in a list. Nothing you type is sent anywhere.