Find the share of tasks that were completed in a period, and the share of those done on time. See how many more tasks a target rate needs, compare several weeks or months, or count a list with tick boxes.

Enter your values

For a day, a week, a month or a sprint: tasks completed out of tasks assigned, on time out of completed, and what a target rate needs.

Your values

All tasks given for the period, done or not.

Of the completed tasks, how many were finished by their due date. Leave it empty if you do not track due dates.

The rate you or your team aim for. Leave it empty if you have none.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose the button below them.

How to use this calculator

  1. Choose Completion rate for one period, Completion rate over several periods or Completion rate of a list with tick boxes.
  2. For one period, type the tasks assigned and the tasks completed. The tasks completed on time and a target rate are optional.
  3. For several periods, add a row for each week, month or sprint in time order. The table and the chart show how the rate changes.
  4. For a list, paste it or open a text file. "x]" before a task means done. A list from the [To-Do List Planner works as it is.
  5. Choose Calculate (or Count my list). You can copy the result, print it or download it as a CSV file.

The formulas

  • Completion rate = tasks completed ÷ tasks assigned × 100.
  • On-time rate = tasks completed on time ÷ tasks completed × 100. On time out of all assigned divides by all tasks instead, so an open task counts as not on time.
  • Tasks needed for a target = target rate × tasks assigned ÷ 100, rounded up to a whole task. A 90% target for 40 tasks needs 36 tasks.
  • Overall rate of several periods = all tasks completed ÷ all tasks assigned × 100. A busy period counts more.
  • Average of the period rates = the sum of the rates ÷ the number of periods. Each period counts the same, so the two numbers differ when periods have different numbers of tasks.

Worked examples

One week. 34 of 40 tasks completed: 34 ÷ 40 × 100 = 85.00%. 29 of the 34 were on time: 85.29%, and 5 were late. Out of all 40 tasks, 72.50% were on time. A 90% target needs 36 tasks, so 2 more were needed: the rate is 5.00 percentage points below the target.

Four weeks. Week 1: 15 of 20 (75.00%). Week 2: 20 of 24 (83.33%). Week 3: 17 of 18 (94.44%). Week 4: 21 of 22 (95.45%). The overall rate is 73 ÷ 84 = 86.90%. The average of the four rates is 87.06%. The rate rose by 20.45 percentage points from week 1 to week 4, and 2 of the 4 weeks reached a 90% target.

A list. Under "Work", 2 of 3 tasks are ticked; under "Home", 1 of 2. In all, 3 of 5 tasks are done: 60.00%.

Which tool to use

  • This page works out rates from numbers or a list you give it, once. To keep a to-do list with due dates and see what is overdue, use the To-Do List Planner. For the same list, both give the same share done.
  • For progress toward a number, such as pages read of a book, use the Progress Percentage Calculator. For a goal made of milestones with weights, use the Goal Completion Calculator.

Limits you should know

  • Every task counts the same. A long task and a short one each count as one task.
  • The rate does not show the quality of the work or why a task was not done. Use it to compare like with like, such as the same person or team over several weeks.
  • Percentages are shown with 2 decimal places, rounded half away from zero. The CSV file has more digits.
  • Up to 120 periods, or 5,000 tasks in a list. Nothing you type is sent anywhere.