Toolvito

Works on this device

Change Failure Rate Calculator

Find the share of your changes or deployments that failed: from two totals, or from a log of changes by week or by month with a chart. You decide what counts as a failed change, and the tool prints your rule with the result.

Enter your values

From the number of changes in a period and how many of them failed.

Your values

All deployments or changes to production in the period.

The changes that failed by your own rule.

Write down what you count as failed, so that the rate means the same thing next time. It is printed with the result.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose Change failure rate from totals or Change failure rate from a log, by week or month.
  2. For totals, type the number of changes in the period and how many failed.
  3. For a log, fill one row for each change with its date, and tick Failed for the ones that failed.
  4. Write your rule for a failed change, so that the rate means the same thing next time.
  5. Choose Calculate. You can copy the result, print it or download it as a CSV file.

The formula

Change failure rate = failed changes ÷ all changes in the period × 100.

It is one of four delivery measures described by the DORA research programme, beside deployment frequency, lead time for changes and time to restore a service. A failed change is usually one that needed a rollback, a hotfix or a fix forward, or that caused an incident. Which changes you count is your own choice: keep it the same.

Weeks run from Monday to Sunday and carry their ISO 8601 numbers, so a week at the turn of the year can belong to the year before or after.

Worked examples

Totals: 9 failed changes out of 120 is 9 ÷ 120 × 100 = 7.5%. That is one failed change for every 13.33 changes.

A log: 8 changes in January and February 2026, of which 2 failed, give 25% over the whole log. January has 5 changes with 2 failed (40%); February has 3 with none failed (0%).

Other tools for the same subject

Limits you should know

  • The rate is only as good as your rule for a failed change and the care with which changes are logged.
  • The tool gives no band of good or poor rates. The bands that yearly industry reports publish change from year to year.
  • A small number of changes gives a rate that moves a lot from one period to the next.
  • The tool reads no deployment or ticket system: you type the changes.

Related tools