Works on this device
Downtime Allowance Calculator
Turn an availability target such as 99.9% into the downtime it allows, turn a downtime back into an availability, see how much of your downtime budget is left after outages, and work out the availability of parts in series and side by side. This page does not watch any website: you type every figure.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose what you want to work out. Downtime allowed by an availability target is the first choice.
- Type the target as a percentage, such as 99.9, or pick a common target from the list.
- Choose how your contract counts a month and a year: 30 days, 31 days, or the days of a month that you name.
- Choose Calculate. Each time is shown in seconds or another unit you choose, and as days, hours, minutes and seconds.
The formulas
- Downtime allowed = (1 − target ÷ 100) × length of the period. A day has 86,400 seconds.
- Availability = (length of the period − downtime) ÷ length of the period × 100.
- Number of nines = −log10(1 − availability). 99.9% is 3 nines; 99.95% is about 3.3.
- Parts in series (every part must work): availability = A1 × A2 × ...
- Parts side by side (one is enough): availability = 1 − (1 − A1) × (1 − A2) × ...
- The two rules for parts assume that the parts fail and are repaired independently of each other.
- All the arithmetic is done with exact fractions, so 99.999% of a year is exactly 315.36 seconds.
Worked examples
99.9% in a year of 365 days: 0.001 × 365 × 86,400 = 31,536 seconds, which is 8 hours 45 minutes 36 seconds. In a 30-day month it is 2,592 seconds (43 minutes 12 seconds), in a week 10 minutes 4.8 seconds and in a day 1 minute 26.4 seconds.
99.99% in a year of 365 days: 3,153.6 seconds, which is 52 minutes 33.6 seconds.
From a downtime: 43.2 minutes of downtime in a 30-day month is 2,592 of 2,592,000 seconds, so the availability is 99.9%.
A budget: a target of 99.9% in a 30-day month allows 43.2 minutes. Two outages of 12 and 18.5 minutes use 30.5 minutes, about 70.6% of the budget, and leave 12 minutes 42 seconds.
Parts: a load balancer at 99.99%, two web servers at 99.5% side by side and one database at 99.9%, all in series: 0.9999 × (1 − 0.005²) × 0.999 = 99.8875%. That is about 9 hours 51 minutes of downtime in a year.
Other tools for the same subject
- To check whether a website is up now, use the Website Uptime Checker. This page watches nothing.
- For availability from the mean time between failures and the mean time to repair, use the Mttr Calculator.
- For the failure side (MTBF, failure rate, reliability over a time), use the Mtbf Calculator.
- For recovery time and recovery point objectives, use the RTO Calculator.
Limits you should know
- Contracts count downtime in different ways. Some leave out planned maintenance, count only business hours, or count a month by its real days. Check how your contract counts before you rely on a figure.
- The rules for parts in series and side by side assume independent failures. A shared cause, such as one power feed or one software fault, makes the real availability lower.
- The tool takes no outage data from any service, and it says nothing about what a target should be.