Works on this device
Bolt Preload Calculator
Work out the preload to aim for in a bolt: a share of its proof load or yield load, with the tensile stress area of its metric or inch thread. Then see how a working load shares between the bolt and the clamped parts, and when the joint opens. You type the strength of your bolt.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose Target preload or Clamp force and joint stiffness.
- Choose the thread: an ISO metric thread with its diameter and pitch, a Unified inch thread with its diameter and threads per inch, or a stress area that you know.
- For the target preload, type the proof stress or the yield strength of your bolt from its standard or maker, and the share of it that you want.
- For the clamp force, type the preload, the working load on each bolt, the grip length, the threaded length in the grip and the moduli of elasticity.
- Choose Calculate. The working shows every step with the numbers.
The formulas
- Target preload: Fi = share × Sp × As, with Sp the proof stress (or Re, the yield strength) and As the tensile stress area.
- Tensile stress area, ISO metric (ISO 898-1): As = (π/4) × ((d2 + d3) ÷ 2)², with d2 = d − 0.649519 P and d3 = d − 1.226869 P. This is (π/4) × (d − 0.938194 P)².
- Tensile stress area, Unified inch (ASME B1.1): As = 0.7854 × (D − 0.9743 ÷ n)² in square inches.
- Bolt stiffness: kb = Ad × At × E ÷ (Ad × lt + At × ld), for the plain shank of area Ad and length ld and the thread of area At and length lt in the grip.
- Clamped parts (Shigley's frustum model): two 30° cones from a bearing face of diameter D (1.5 d unless you type it) meet in the middle of the grip l. One cone of thickness t has k = π E d tan 30° ÷ ln[((2 t tan 30° + D − d)(D + d)) ÷ ((2 t tan 30° + D + d)(D − d))], and km = k(l/2) ÷ 2.
- Load share: C = kb ÷ (kb + km). Bolt load Fb = Fi + C × P. Clamp force Fm = Fi − (1 − C) × P. The joint opens at P0 = Fi ÷ (1 − C).
Worked example
An M12 × 1.75 bolt has As = (π/4) × (12 − 0.938194 × 1.75)² = 84.27 mm². With a proof stress of 580 MPa its proof load is 48.87 kN, and 75% of it gives a target preload of 36.66 kN.
Take a preload of 36.7 kN in steel parts 40 mm thick, with 10 mm of thread in the grip. The bolt stiffness is 520,929 N/mm and the parts 2,159,486 N/mm, so the bolt takes C = 0.1943 of a working load. A load of 10 kN raises the bolt load to 38.64 kN and leaves 28.64 kN of clamp force. The joint would open at 45.55 kN.
The proof stress and the 75% share are examples for trying the tool. Check the figures of your own bolt in its standard.
Limits you should know
- This is ideal arithmetic for study and planning, not a design approval and not professional advice. The design must follow the code or standard that applies to your joint and be checked by a qualified engineer.
- Proof stresses, yield strengths and the share to aim for are your figures. No property class or grade table is built in.
- The joint model is the simple one of Shigley: clamped parts of one material that reach well beyond the cones, a load that acts under the head and the nut, an elastic bolt. It leaves out gaskets, tapped holes, eccentric loads, and the loss of preload by settling or heat. VDI 2230 gives a fuller method.
- The thread sizes are basic sizes from the defining relations. Check the diameter and pitch of your thread in its standard.
- For the tightening torque, use the Bolt Torque Calculator. For the length of engagement and the stripping strength of the threads, use the Screw Thread Calculator. For bolts in shear, use the Bolt Shear Calculator.