Stock cover tells you how long your stock lasts at the demand you expect. Enter the stock on hand, the stock on order and the demand of each item, and the calculator gives the cover in days, weeks or months and the date the stock runs out.

Enter your values

Cover = stock ÷ demand per period. For each item you get the cover of the stock on hand, the cover with the stock on order, and the date the stock runs out.

Your values

Demand is per one of these periods, and the cover is counted in the same periods.

The stock figures are as at the end of this day. Leave it empty to use the date of your device.

The cover you want to keep. Items below it are marked, with the units to order to reach it.

Items

One row for each item: the stock on hand, the stock already on order (optional) and the average demand per period. Use one measure in a row: units, or money at the same prices.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose the time unit: days, weeks or months. Demand is per one of these periods.
  2. Enter the date of your stock count, or leave it empty to use today.
  3. Add one row for each item: the stock on hand, the stock already on order and the average demand per period. Add a target cover if you want to see which items need an order.
  4. Choose Calculate. The table gives the cover of each item and the date its stock runs out.
  5. If your forecast is different for each coming period, choose Forward cover against a forecast that changes and list the demand of each period.

The formulas

  • Cover of stock on hand = stock on hand ÷ demand per period.
  • Cover with stock on order = (stock on hand + stock on order) ÷ demand per period. It assumes the stock on order arrives before the stock on hand runs out.
  • Units to reach a target cover = target cover × demand per period − (stock on hand + stock on order).
  • Forward cover: go through the coming periods one by one and take away the forecast demand. The cover is the number of whole periods the stock meets, plus the share of the next period it still meets.
  • Run-out date = the count date + the cover. The figures are as at the end of the count date, and the first period starts the next day. A part of a day counts as a whole day.

Worked example

On 2 March 2026 a shop has 120 blue mugs, 200 more on order, and sells 45 mugs a week. The stock on hand covers 120 ÷ 45 = 2.67 weeks, about 18.7 days, so it runs out on 21 March 2026. With the mugs on order the cover is 320 ÷ 45 = 7.11 weeks.

With a target cover of 4 weeks, the shop needs 4 × 45 = 180 mugs and has 320, so the mugs are above the target. Gift boxes, with 15 on hand, 50 on order and 20 sold a week, need 80 and have 65: 15 more are needed.

Forward cover: 600 units on hand and a forecast of 120, 150, 130, 160 and 140 for the next weeks. The first four weeks use 560 units, so 40 are left for the fifth week, which needs 140. The forward cover is 4 + 40 ÷ 140 = 4.29 weeks.

Use with other measures

Cover looks forward, at the demand you expect. Days inventory outstanding looks back, at the cost of goods sold of a past period: use the Days Inventory Outstanding Calculator for it.

To decide when to order, compare the cover with your lead time, or use the Reorder Point Calculator.

Limits you should know

  • Use one measure in a row: units, or money at the same prices for stock and demand.
  • Demand is an average or a forecast that you type. Real demand moves, so the stock can run out sooner.
  • Up to 300 items and a forecast of up to 520 periods. Demand that is not met in the forecast is not carried to the next period.
  • The result is arithmetic on the figures you type.