Stock Reorder Calculator

This calculator plans your reorders over time. Enter the stock on hand, the demand, the lead time, your reorder point and your order quantity, and it shows week by week (or day or month) when to order, when the goods arrive and how much stock is left.

Enter your values

A schedule of stock, orders and deliveries: an order of the order quantity is placed whenever the stock on hand plus the stock on order falls to the reorder point.

Your values

Demand is per one of these periods, and the lead time is counted in the same periods.

The stock on hand is as at the end of this day, and period 1 starts the next day. Leave it empty to use the date of your device.

Period 1 is the first period of the plan. Used only when there is stock on order.

Whole periods from placing an order to having the goods ready to use.

Order when the stock on hand plus the stock on order falls to this level. The Reorder Point Calculator works it out.

The amount of one order. The Economic Order Quantity Calculator works it out.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose the time unit: days, weeks or months. Demand is per period, and the lead time is a whole number of periods.
  2. Enter the date of your stock figures, or leave it empty to use today. Enter the stock on hand and any stock already on order, with the period in which it arrives.
  3. Enter the demand: the same in every period, or a forecast for each period.
  4. Enter the lead time, your reorder point and your order quantity. Choose what happens to demand you cannot meet: it waits for the next delivery, or it is lost.
  5. Choose Calculate. The plan shows each period, the orders and their arrival dates. The chart shows the stock and the stock position against the reorder point.
  6. To see only the date of your next order, choose When to order next.

How the plan is worked out

  • At the start of each period, the orders that are due arrive.
  • Then the stock position is checked: stock on hand − orders waiting + stock on order. If it is at or below the reorder point, an order of the order quantity is placed. If one order is not enough to lift the position above the reorder point, more lots are ordered.
  • An order arrives the lead time later, at the start of a period. Then the demand of the period is taken from stock.
  • When to order next: time until you order = (stock position − reorder point) ÷ demand per period. Stock left when the order arrives = stock position at the order − demand × lead time.
  • The plan checks the stock once each period. When to order next works to the day, so its order date can be a few days earlier.

Worked example

The stock figures are as at 2 March 2026: 400 units on hand. Demand is 60 units a week, the lead time is 3 weeks, the reorder point is 250 and the order quantity is 400.

After 3 weeks the stock is 220, so at the start of week 4 (24 March 2026) the plan orders 400 units. They arrive at the start of week 7 (14 April 2026), when 40 units are left. Over 26 weeks the plan places 4 orders of 400 units, the lowest stock is 20 units, and all demand is met.

When to order next: the position of 400 falls to 250 after (400 − 250) ÷ 60 = 2.5 weeks, so you order on 20 March 2026. The goods arrive 3 weeks later, on 10 April 2026, when 250 − 180 = 70 units are left.

Where the figures come from

The reorder point = demand during the lead time + safety stock: work it out with the Reorder Point Calculator. The order quantity can come from the Economic Order Quantity Calculator. To see only how long the stock lasts, use the Stock Cover Calculator.

Limits you should know

  • The lead time is the same for every order and a whole number of periods. Real deliveries can be late.
  • Up to 400 periods. Quantities may have decimals.
  • The plan follows your figures exactly. It does not change the reorder point or the order quantity when demand changes.
  • The result is arithmetic on the figures you type.