The stock a business holds in its supply chain has three parts: cycle stock from ordering in batches, safety stock, and stock on the way. Enter your demand, order quantity, safety stock and transit time, and the calculator adds the parts up. It also measures lead times from past orders.

Enter your values

The average stock in the chain is cycle stock (half an order) + safety stock + stock on the way (pipeline stock).

Your values

Demand is per one of these periods, and the transit time is counted in the same periods.

The amount of one order or one batch. The Economic Order Quantity Calculator can work it out.

The Safety Stock Calculator works it out from a service level.

The time the goods spend on the way, from the supplier to you. Use 0 if you do not own them before they arrive.

To see the value of each part. Up to 4 decimal places.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Calculate.

How to use this calculator

  1. Choose the time unit: days, weeks or months. Enter the average demand per period and the transit time in the same periods.
  2. Enter the order quantity and the safety stock. Add a unit cost to see the value of each part.
  3. Choose Calculate. For many items or many stock places, choose Supply chain inventory of several items or locations.
  4. To measure a lead time, choose Lead time from past orders and enter the order date and the receipt date of each order.
  5. To find when goods will arrive, or the latest day to order, choose Arrival date or latest order date.

The formulas

  • Cycle stock = order quantity ÷ 2. Stock falls from a full order to about nothing before the next order arrives, so half an order is on hand on average.
  • Safety stock: the extra stock kept for higher demand or late deliveries.
  • Pipeline stock (in transit) = average demand × transit time. It is the stock you own while it is on the way.
  • Total average inventory = cycle stock + safety stock + pipeline stock. Value = units × unit cost.
  • Lead time = receipt date − order date. Working days count Monday to Friday. The standard deviation divides by the number of orders − 1.

Worked example

An item sells 40 units a day. It is ordered 850 at a time, the safety stock is 140 units, and goods spend 6 days on the way. Cycle stock = 850 ÷ 2 = 425, pipeline stock = 40 × 6 = 240, so the total is 425 + 140 + 240 = 805 units, about 20.1 days of demand. At 12.50 a unit, that is 5,312.50 + 1,750.00 + 3,000.00 = 10,062.50.

Five past orders took 9, 11, 8, 14 and 9 days. The average lead time is 10.2 days, the standard deviation is 2.39 days, and the longest wait was 14 days.

An order placed on Monday 2 March 2026 with a lead time of 10 calendar days arrives on Thursday 12 March 2026, which is 8 working days later.

Where each part comes from

The order quantity comes from the Economic Order Quantity Calculator. The safety stock comes from the Safety Stock Calculator, which can use the lead time figures of this page. The Reorder Point Calculator tells you when to order.

Limits you should know

  • The parts are averages over time. Real stock goes up and down between orders.
  • Working days skip Saturdays and Sundays only. Public holidays are not known to this tool.
  • Carrier transit times and postal rates are not included: type the transit time your carrier gives you.
  • Quantities may have decimals. Unit costs may have up to 4 decimal places. Each value is rounded to the cent.
  • The result is arithmetic on the figures you type.