Works on this device
Safety Stock Calculator
Safety stock is the extra stock you keep so that you do not run out when demand is higher or a delivery is later than usual. Choose a method, enter your demand and lead time, and the calculator gives the safety stock and the reorder point.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose a method. Safety stock from a service level is the usual statistical method. The average-max method and a fixed cover are simpler rules.
- Choose the time unit: days, weeks or months. Enter demand per period and lead times in the same periods.
- For the statistical method, choose what varies (demand, lead time or both) and enter the standard deviations. Then enter a cycle service level such as 95%, or a z-value.
- Choose Calculate. If you only have past demand figures, choose Safety stock from past demand and paste them.
The formulas
- Demand varies: SS = z × σd × √L.
- Lead time varies: SS = z × d × σL.
- Both vary, independently: SS = z × √(L × σd² + d² × σL²).
- Both vary, added: SS = z × σd × √L + z × d × σL. This gives more stock and fits when high demand and long lead times come together.
- Average-max: SS = highest demand × longest lead time − average demand × average lead time.
- Fixed cover: SS = average demand × days of cover. Percent: SS = percent ÷ 100 × average demand × average lead time.
- Here d is the average demand per period, L the average lead time, σd the standard deviation of demand per period and σL the standard deviation of the lead time.
- Reorder point = d × L + SS.
Service level and z
z is the value of the standard normal distribution for the cycle service level. For 95% it is 1.6449, for 99% it is 2.3263 and for 90% it is 1.2816. The calculator works z out from the level, so you can use any level from 50% to just below 100%.
The cycle service level is the chance of no stockout in one order cycle. It is not the fill rate, which is the share of the demand met from stock. A 95% cycle service level usually gives a fill rate well above 95%.
Worked example
Demand is 40 units a day with a standard deviation of 8, and the lead time is 9 days. For a 95% cycle service level, z = 1.6449. The standard deviation of demand during the lead time is 8 × √9 = 24, so the safety stock is 1.6449 × 24 = 39.48 units, or 40 whole units. The demand during the lead time is 40 × 9 = 360, so the reorder point is 399.48.
If the lead time also varies, with a standard deviation of 2 days, the safety stock is 1.6449 × √(9 × 8² + 40² × 2²) = 1.6449 × 83.52 = 137.38 units.
By the average-max method, with a highest demand of 55 a day and a longest lead time of 13 days, the safety stock is 55 × 13 − 40 × 9 = 355 units.
Limits you should know
- The statistical formulas assume that demand in each period follows a normal distribution and that periods do not depend on each other. For slow items with many periods of zero demand, they can be far off.
- Use the same time unit for demand, lead time and the standard deviations. A standard deviation per week is not 7 times one per day.
- Safety stock lowers the chance of a stockout. It cannot remove it.
- For the order quantity, use the Economic Order Quantity Calculator. For the reorder point in depth, use the Reorder Point Calculator.