A stockout costs you the margin on sales you lose, the extra work of backorders and the cost of rush deliveries. Enter your own figures for each stockout to add them up, or estimate the expected stockout cost of a reorder point from the variation in demand.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Add one row for each stockout: the sales lost in units, the margin lost on each (selling price − unit cost), the units customers waited for, your cost for each of those, and any rush delivery or other cost.
- Choose Calculate. You get the total cost, its parts and the cost of each stockout.
- To estimate the stockouts you can expect, choose Expected stockout cost of a reorder point. Enter the demand and lead time (or the mean and standard deviation of demand during the lead time), your safety stock, reorder point or service level, the order cycles a year and your cost of one unit short.
The formulas
- Lost margin = sales lost × (selling price − unit cost). Backorder cost = units backordered × cost per backordered unit. Total = lost margin + backorder cost + expediting and other costs.
- Expected stockout cost: demand during the lead time is taken as normal, with mean μ and standard deviation σ. z = (reorder point − μ) ÷ σ = safety stock ÷ σ.
- Chance of a stockout in one cycle = 1 − Φ(z). Expected units short per cycle = σ × L(z), with the standard normal loss function L(z) = φ(z) − z × (1 − Φ(z)).
- Expected cost per cycle = expected units short × cost of one unit short + chance of a stockout × cost of each stockout. A year = cost per cycle × order cycles a year.
- Fill rate = 1 − expected units short ÷ order quantity.
Worked example
Three stockouts: 40 mugs lost at a margin of 6.50 (260.00), 25 mugs backordered at 2.20 each (55.00) and a rush delivery of 180.00; 1,200 bolts backordered at 0.05 (60.00) and a rush delivery of 95.00; 65 gift boxes lost at a margin of 3.75 (243.75). The total is 893.75: 503.75 of lost margin, 115.00 of backorder costs and 275.00 of rush deliveries.
Expected cost: demand is 40 units a day with a standard deviation of 8, and the lead time is 9 days, so μ = 360 and σ = 8 × √9 = 24. With a safety stock of 40, z = 40 ÷ 24 = 1.6667. The chance of a stockout in a cycle is 4.78%, L(z) = 0.01983 and the expected units short are 24 × 0.01983 = 0.476 a cycle. At 6.50 a unit short and 14.6 cycles a year, that is 3.09 a cycle and 45.16 a year. With an order quantity of 1,000 the fill rate is 99.95%.
Limits you should know
- Every cost is your own figure. No typical stockout cost is given: it depends on the goods, the customers and the trade.
- Lost goodwill (customers who do not come back) is hard to measure. Add it as another cost only when you have a basis for it.
- The expected cost uses one method: normal demand during the lead time and shortages counted once a cycle. It fits backorders best. For slow items with many periods of zero demand it is only an estimate.
- For the safety stock and the reorder point themselves, use the Safety Stock Calculator and the Reorder Point Calculator.
- The result is arithmetic on the figures you type. It is not financial advice.