Works on this device
Plumbing Flow Demand Calculator
Find the design (peak) flow a water supply must carry. Add up the water supply fixture units and read the flow from your code's table, work out the peak by Hunter's probability method for fixtures of one kind, or apply a simultaneity factor to the flows of your outlets.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose a method. Demand flow from fixture units follows the US style codes; the other two are plain methods with their formula shown.
- For fixture units, type each fixture with its water supply fixture units from your code, or type the total. Then type the rows of your code's table that turns fixture units into a flow. The boxes start empty: the tool holds no code values. Try an example fills in example values that are not taken from any code.
- For Hunter's method, type the number of fixtures of one kind, the flow of one, how long one use lasts and how often each is used at the busiest time.
- Choose Calculate. The working shows each step.
The formulas
- Total load = Σ (fixture units of one fixture × how many).
- Flow from your table: between two rows, flow = f1 + (f2 − f1) × (FU − FU1) ÷ (FU2 − FU1). A continuous demand is added if your code asks for it.
- Hunter's method: each fixture is in use with the chance p = t ÷ T, so the number in use follows the binomial distribution P(X = k) = C(n, k) × p^k × (1 − p)^(n − k). The design number m is the smallest with P(X ≤ m) at or above the share you choose (Hunter took 99 %). Peak flow = m × q.
- Simultaneity factor: Q = φ × ΣQ, with ΣQ the flows of all outlets added up.
Worked examples
Three water closets at 2.5, four lavatories at 1, three showers at 2, a kitchen sink at 1.5 and a clothes washer at 3 (example values) add up to 22 fixture units. With example rows of 14 gpm at 20 and 22 gpm at 40 fixture units, the flow is 14 + 8 × 2 ÷ 20 = 14.8 gpm.
Twenty fixtures of 4 gpm, each used for 60 s once every 300 s at the busiest time, have p = 0.2. No more than 8 are in use for 99.0 % of that time, so the peak flow is 8 × 4 = 32 gpm, against 80 gpm if all ran at once.
Four basin taps at 0.1 L/s, two showers at 0.15 L/s and a sink tap at 0.2 L/s give ΣQ = 0.9 L/s. With a simultaneity factor of 0.4 (example), Q = 0.36 L/s.
Limits you should know
- Fixture units, demand curves and tables, simultaneity factors and design flows come from the plumbing code in force where the work is done (for example the UPC, the IPC, EN 806-3 or a national method). That code decides; this tool does not give the required values.
- Hunter's curve is known to give high flows for homes with modern low-flow fixtures; newer methods exist. Use the method your code allows.
- Hunter's method here is for fixtures of one kind. For mixed fixtures, codes use fixture units.
- With the design flow, size the pipe on the Water Pipe Size Calculator. The drainage side is on the Drainage Fixture Unit Calculator.
- This is arithmetic for the values you type. A water supply must be designed to your local code and checked by a qualified person. It is not professional advice.