Works on this device
Soil Amplification Worksheet
A worksheet for how the soil of a site changes earthquake shaking. Apply the site coefficients Fa and Fv (ASCE 7 style) or the soil factor S (EN 1998-1 style) that you take from your code to the spectral values of your site, and work out the average shear wave velocity and the period of your soil layers.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this worksheet
- Choose the worksheet: Site coefficients on mapped spectral values for codes such as ASCE 7 and the IBC, or Soil factor on the design ground acceleration for EN 1998-1 and its national annexes.
- Type the spectral values or the ground acceleration of your site from the maps or tool your code names, and the coefficients from your code's tables. The boxes start empty: the tool holds no code values. Try an example fills in example values that belong to no place and no table.
- Type the site class you use, if you like. The tool shows it on the worksheet and does not choose it.
- To compare your soil with the class limits of your code, use Shear wave velocity and period of the soil layers with the layers of your site investigation.
The formulas
- Site coefficients: SMS = Fa × Ss and SM1 = Fv × S1. With the design factor of your code (2/3 in ASCE 7): SDS = factor × SMS and SD1 = factor × SM1.
- Soil factor: ag = γI × agR; on the soil ag × S; the plateau of the elastic spectrum ag × S × the amplification factor of your code.
- Time-averaged shear wave velocity: V̄s = Σd ÷ Σ(d ÷ Vs); Vs30 uses the top 30 m.
- Period of the soil column: T = 4H ÷ V̄s, for soil of thickness H on rock.
Worked examples
With example values Ss = 1.2 g, S1 = 0.5 g, Fa = 1.1 and Fv = 1.8: SMS = 1.1 × 1.2 = 1.32 g and SM1 = 1.8 × 0.5 = 0.90 g. With a factor of 2/3, SDS = 0.88 g and SD1 = 0.60 g.
With an example agR = 0.25 g, γI = 1.0 and S = 1.2: ag × S = 0.30 g; with a plateau factor of 2.5, the plateau is 0.75 g.
Layers of 3 m at 180 m/s, 12 m at 250 m/s and 20 m at 420 m/s: the top 30 m take 3/180 + 12/250 + 15/420 = 0.1004 s to cross, so Vs30 = 298.9 m/s. All 35 m take 0.1123 s, so V̄s = 311.7 m/s and T = 4 × 35 ÷ 311.7 = 0.449 s.
Limits you should know
- Site coefficients, soil factors, mapped values, the design factor and the limits of each site class come from the code in force where the building stands. That code decides; this tool does not give the required values, and it does not choose the site class.
- Some codes ask for a site-specific study instead of Fa and Fv for some site classes or strong shaking. The worksheet does not check that.
- The period 4H ÷ V̄s is a simple estimate for layers on rock. It is not a site response analysis.
- Earth pressure on walls in an earthquake is on the Earth Pressure Calculator, and bearing capacity on the Soil Bearing Capacity Calculator.
- This is a worksheet for the values you type. Seismic design must be done and checked by a qualified engineer. It is not professional advice.