Energy Performance Indicator Calculator
An energy performance indicator (EnPI) is a figure that shows how well a site uses energy, such as kWh for each tonne made. This tool works out an indicator for a baseline period and a reporting period, and compares energy used with a baseline line.
Enter your values
Check these values
This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose Indicator as a ratio, and its change between two periods.
- Choose whether the indicator is energy for each unit of a driver, or energy alone.
- Type the energy and the driver of the baseline period, and the same for the reporting period. Both periods must have the same length.
- Type a target in percent if you have one.
- Choose Calculate.
- If you have a baseline line with a slope and a base load, choose Indicator against a baseline line and add one row for each reporting period. You can also paste rows from a spreadsheet. Try an example fills the empty boxes of that option with example values.
- Tick Save my entries on this device to keep your rows and add a period on your next visit. Download my entries gives you a file that you can open here again.
The formulas
- Indicator as a ratio = energy ÷ driver.
- Change = (indicator in the reporting period ÷ indicator in the baseline period − 1) × 100. A minus sign is an improvement.
- Energy saved = indicator in the baseline period × driver in the reporting period − energy in the reporting period.
- Baseline energy of a period = slope × driver + base load.
- Indicator against the baseline = energy used ÷ baseline energy × 100. Below 100 means less energy than the baseline expects.
- Cumulative sum (CUSUM) = the differences (energy used − baseline energy) added up, period by period.
Worked examples
A ratio. In the baseline year a plant used 520,000 kWh and made 4,200 tonnes: 123.81 kWh for each tonne. In the reporting year it used 498,000 kWh and made 4,350 tonnes: 114.48 kWh for each tonne. The indicator fell by 7.53%. At the baseline indicator, 4,350 tonnes would have taken 538,571 kWh, so 40,571 kWh were saved.
A baseline line. A baseline has a slope of 9.5 kWh for each degree day and a base load of 3,200 kWh for a month. A month with 410 degree days is expected to use 9.5 × 410 + 3,200 = 7,095 kWh. It used 6,820 kWh, which is 275 kWh less, and the index is 96.12.
Over four months with 410, 365, 290 and 170 degree days, the baseline expects 24,532.5 kWh. The site used 23,940 kWh. The indicator is 97.58%, and 592.5 kWh were saved.
Where the terms come from
Energy performance indicator (EnPI) and energy baseline (EnB) are terms of ISO 50001, the standard for energy management systems. An organisation chooses its own indicators. This tool does the arithmetic only. It holds no limit value and no target of any standard, and it does not check a management system.
Limits you should know
- A simple ratio takes all the energy to rise and fall with the driver. Most sites have a base load that does not. Then the ratio falls when the driver rises, even if nothing was improved. A baseline line separates the base load.
- The two periods of a comparison must have the same length. The periods of the baseline option must have the same length as the periods that the baseline was fitted to.
- A baseline line holds only inside its own range of driver values, and only while the site is used as before.
- A single period can lie above or below the baseline by chance. Look at the cumulative sum over several periods.
- The tool does not say whether an indicator is the right one for your site, and it does not prove what caused a change.
- Saving is off unless you tick Save my entries on this device. Saved rows stay in this browser only. Clearing the data of your browser removes them, so keep your own copy with Download my entries.
- The values that Try an example fills in are made up. They describe no real site.