Works on this device
Capacity Utilization Calculator
Find how much of its capacity a plant, line, machine or team really used. The result always says whether it uses the design capacity or the effective capacity.
Enter your values
Check these values
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Calculate.
Your result
How it was worked out
How to use this calculator
- Choose Utilization of one resource or Utilization by resource.
- Enter the actual output and the capacity for the same period, in one unit: units made, hours or tonnes.
- For one resource, type the design capacity, the effective capacity or both. For several resources, choose which capacity the rows hold.
- Choose Calculate. Copy, print or download the result as a CSV file.
The formula
Capacity utilization = actual output ÷ capacity × 100.
- Design capacity is the most that could be made in the scheduled time with no stops at all.
- Effective capacity is what could be made after breaks and planned stops, such as planned maintenance and changeovers.
- Utilization of the design capacity is always the lower of the two figures. Some textbooks call actual output ÷ effective capacity "efficiency".
- Unused capacity = capacity − actual output.
- For several resources, the figure for all rows is the sum of the actual figures ÷ the sum of the capacities. It has a meaning only when every row uses the same unit, such as hours.
Worked example
A line made 15,300 units in a week. Its design capacity is 19,200 units and its effective capacity is 18,000 units. Utilization of design capacity = 15,300 ÷ 19,200 = 79.69%. Utilization of effective capacity = 15,300 ÷ 18,000 = 85.00%. The unused effective capacity is 2,700 units.
Four machines worked 142, 96, 147 and 120 hours with 160, 160, 150 and 150 hours of capacity. The lathe is the most loaded at 98.00%. All four together used 505 of 620 hours, which is 81.45%.
Related tools
- Work out the design and effective capacity from machines, shifts and speeds with the Production Capacity Calculator.
- Losses of availability, speed and quality of one machine: Overall Equipment Effectiveness Calculator.
- Output against a standard time or rate: Production Efficiency Calculator.
Limits you should know
- Use the same period and the same unit for the actual figure and the capacity.
- A result above 100% means more was made than the capacity you typed: check the figures, or whether overtime or extra shifts were used.
- No target or benchmark is built in. A high utilization can also mean long queues and little room for problems.