Software Project Estimator

Estimate how much work a software project is, what it costs and how long it takes. List the tasks with three estimates each, or size the system with COCOMO, function points or use case points. The server can then plan who does which task and when.

Enter your values

List the tasks with optimistic, most likely and pessimistic values and what each waits for. You get the effort with a range, the cost and the shortest time to finish.

Your values

Use the same unit in every row. A day is one person working one day.

The share of outcomes that you want the estimate to cover, from 50% to below 100%. 50% gives the mean.

In your currency, for the unit of the estimates. Leave it empty for no cost.

Gives the finish date of the critical path in working days. Holidays are not left out here.

Tasks

Three values for each task: O ≤ M ≤ P. “Starts after tasks” takes task numbers, such as 2, 3. “Who can do it” takes names separated by commas; the server plan below gives each task to one of them.

This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.

Your values are worked out in this browser. They are not sent to a server.

Your result will show here

Fill in the values, then choose Estimate.

Plan the tasks with your people

Plan the tasks

Uses the tasks of Tasks: three-point estimate and critical path above: each task with its PERT mean as its length (rounded up to 0.01, or to whole days with a start date), the tasks it waits for and the people who can do it. A person does one task at a time.

In the unit of the estimates, counted from the start. If it cannot be done, the result says which links stand in the way.

The estimates above are worked out in your browser. When you use this box, the task names, their lengths, links and the names of the people are sent to the Toolvito server to make the plan. Download the result within one hour after the job finishes. Choose Delete files now to request earlier removal. The hourly cleanup normally removes files within one to two hours after completion.

How to use it

  1. Choose a method under How do you want to estimate?.
  2. For Tasks, type each task with an optimistic, a most likely and a pessimistic value, the tasks it must wait for (by number) and who can do it.
  3. Press Estimate. You get the effort with a range, the cost if you give a rate, and the shortest time to finish.
  4. To see when each task can happen when every person does one task at a time, press Plan the tasks in the box below.

The four methods

  • Tasks (PERT): each task gets the mean (O + 4 × M + P) ÷ 6. The means add up to the effort; the critical path (the longest chain of tasks that wait for each other) gives the shortest time.
  • COCOMO: effort and time from the expected lines of code. Basic COCOMO (1981) needs the size and the kind of project; COCOMO II (2000) also rates 5 scale factors and 17 cost drivers.
  • Function points (IFPUG): count the inputs, outputs, inquiries and data files of the system, adjust for 14 general characteristics if you want, and turn the points into hours with your own rate of hours per point.
  • Use case points: actors and use cases weighted by complexity, adjusted by 13 technical and 8 environmental factors, then hours per point (20 by default).

Planning on the server

The plan uses the tasks of Tasks (PERT) with their mean lengths. Each task can be done by any one of the names typed for it, and a person does one task at a time. The solver finds the earliest finish and says whether it is proved to be the best. Every plan is checked again by separate code.

With a start date (estimates in days) the plan gives a first and a last working day for each task. You can also give a time the project must finish within: if that is impossible, the result says which links make it so.

Good to know

  • These are models, not promises. Compare two methods and check them against your own past projects.
  • Effort is all the work added up (person-days or person-months). Time is how long the calendar runs. More people shorten the time only where tasks can run side by side.
  • For a single list of tasks that do not wait for each other, the Task Estimate Calculator shows more confidence levels.