Software Project Estimator
Estimate how much work a software project is, what it costs and how long it takes. List the tasks with three estimates each, or size the system with COCOMO, function points or use case points. The server can then plan who does which task and when.
This is off unless you turn it on. Saved entries stay in this browser only. Untick the box to delete them.
Your values are worked out in this browser. They are not sent to a server.
Your result will show here
Fill in the values, then choose Estimate.
Your result
How it was worked out
How to use it
Choose a method under How do you want to estimate?.
For Tasks, type each task with an optimistic, a most likely and a pessimistic value, the tasks it must wait for (by number) and who can do it.
Press Estimate. You get the effort with a range, the cost if you give a rate, and the shortest time to finish.
To see when each task can happen when every person does one task at a time, press Plan the tasks in the box below.
The four methods
Tasks (PERT): each task gets the mean (O + 4 × M + P) ÷ 6. The means add up to the effort; the critical path (the longest chain of tasks that wait for each other) gives the shortest time.
COCOMO: effort and time from the expected lines of code. Basic COCOMO (1981) needs the size and the kind of project; COCOMO II (2000) also rates 5 scale factors and 17 cost drivers.
Function points (IFPUG): count the inputs, outputs, inquiries and data files of the system, adjust for 14 general characteristics if you want, and turn the points into hours with your own rate of hours per point.
Use case points: actors and use cases weighted by complexity, adjusted by 13 technical and 8 environmental factors, then hours per point (20 by default).
Planning on the server
The plan uses the tasks of Tasks (PERT) with their mean lengths. Each task can be done by any one of the names typed for it, and a person does one task at a time. The solver finds the earliest finish and says whether it is proved to be the best. Every plan is checked again by separate code.
With a start date (estimates in days) the plan gives a first and a last working day for each task. You can also give a time the project must finish within: if that is impossible, the result says which links make it so.
Good to know
These are models, not promises. Compare two methods and check them against your own past projects.
Effort is all the work added up (person-days or person-months). Time is how long the calendar runs. More people shorten the time only where tasks can run side by side.
For a single list of tasks that do not wait for each other, the Task Estimate Calculator shows more confidence levels.